CLEANING PROCESS
A two-stage screening process includes an inner cone screen for large trash and an outer drum screen for fines. Cleaned grain is emptied through a built-in chute.
|
MOVE TRASH
An optional trash pan can be added to model 480 which collects the fines and with a built-in auger, moves the trash to one end of the cleaner. It is then loaded into a trash pan for easy cleanup.
|
TRANSPORT
The intake auger can be swiveled around to the side of the cleaner and securely attached for transport. 15" wheels and a full frame transport are included.
|
PRECISE PLACEMENT
The utility auger slide bar allows the auger to be placed in transport mode or positioned directly over the intake spout.
|
UNLOAD CLEAN GRAIN
An optional trash pan can be added to model 480 which collects the fines and with a built-in auger, moves the trash to one end of the cleaner. It is then loaded into a trash pan for easy cleanup.
|
INTAKE AUGER
The intake auger can be swiveled around to the side of the cleaner and securely attached for transport. 15" wheels and a full frame transport are included.
|